
BFG SupplyFree freight available on qualifying orders.
Watson Gloves Flextime Impact w/Cut XL Dryhide Water Resist
From $67.80
Excl. tax
| SKU | Default | Price | Quantity |
|---|---|---|---|
| bfg-WG005TPCX | Default | $67.80 | MOQ 6 |
Can be shipped immediately (42 in stock)
Other customers also viewed
- BFG Supply

BGC Nitrile Tough Max Medium Glove w/ Cool Max
$7.92Excl. tax12 left - BFG Supply

BGC Mens Goatskin Leather Driver L White
$12.10Excl. tax30 left - BFG Supply

BGC Mens Premium Leather Driver Glove XXL
$10.62Excl. tax14 left - BFG Supply

BGC Thermal Glove Large Grey
$9.10Excl. tax24 left - BFG Supply

BGC Glove Gardware 13G Orange Double Nitrile S
$7.22Excl. tax60 left - BFG Supply

BGC Bamboo Nitrile Glove Medium Green
$7.50Excl. tax1596 left - BFG Supply

BGC Womens Performance Glove XS Assorted Colors
$16.99Excl. tax126 left - BFG Supply

DeWalt Glove SecureFit Perform M
$18.47Excl. tax23 left
Questions about this product
B2B buying basics while you compare specs, lead times, and pricing.
- Where does wholesale pricing appear for Watson Gloves Flextime Impact w/Cut XL Dryhide Water Resist?
- After you sign in with an approved B2B profile, contract or group pricing typically replaces any public list numbers on the product page and in cart. Guests may still see list pricing or prompts to request access depending on vendor rules.
- Can I add this item to a cart that already contains another supplier’s SKUs?
- Yes when both vendors participate in the shared storefront checkout. Each supplier section keeps its own freight, minimums, and payment methods so totals stay accurate before you submit.
- How do I confirm specifications before I buy?
- Use the description, attributes, and downloadable assets on the product page. Engineers should still verify cut sheets against their submittal package because manufacturers refresh specs on their own cadence.
- Who should I contact if stock or lead time looks wrong?
- Message your Order Junky rep or use the contact page with the product URL attached. Include the quantity and ship to region so support can confirm inventory and vendor backorder policies quickly.